search

Handouts at Press Conference

Aug 13, 2018

Changes in the amount of water transferred from groundwater drains to reactor and turbine buildingsand in the amount of groundwater and rainwater flowing into the buildings(208.1 KB)
Aug 6, 2018

Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(290.6 KB)
Jul 30, 2018

Nuclide Analysis Results of Fish and Shellfish (Ocean Area Within 20km Radius of Fukushima Daiichi Nuclear Power Station) (excluding the port)(279.9 KB)
Jul 30, 2018

Nuclide Analysis Results of Fish (52.9 KB)
Jul 30, 2018

Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(126.2 KB)
Jul 26, 2018

Fuel removal from the spent fuel pool at Fukushima Daiichi Nuclear Power Station Unit 3(2.0 MB)
Jul 23, 2018

Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(283.7 KB)
Jul 17, 2018

Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(283.6 KB)
Jul 9, 2018

Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(125.4 KB)
Jul 2, 2018

Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(124.2 KB)
Jun 28, 2018

Investigation of the Operating Floor after opening the Outer West Wall of the Unit 2 Reactor Building(542.2 KB)
Jun 18, 2018

Nuclide Analysis Results of Fish and Shellfish (Ocean Area Within 20km Radius of Fukushima Daiichi Nuclear Power Station) (excluding the port)(76.8 KB)
Jun 18, 2018

Nuclide Analysis Results of Fish <Port Area of Fukushima Daiichi Nuclear Power Station>(78.3 KB)
Jun 18, 2018

Nuclide Analysis Results of Fish and Shellfish <Ocean Area Within 20km Radius of Fukushima Daiichi Nuclear Power Station> Samples collected in the fourth quarter of FY2017(71.0 KB)
Jun 18, 2018

Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(126.6 KB)
Jun 11, 2018

Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(127.9 KB)
Jun 4, 2018

Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(125.9 KB)
May 28, 2018

Wall dismantling work required to create an opening in the outer west wall of the Fukushima Daiichi Nuclear Power Station Unit 2 reactor building has commenced(138.8 KB)
May 28, 2018

Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(126.8 KB)
May 25, 2018

Nuclide Analysis Results of Fish and Shellfish (Ocean Area Within 20km Radius of Fukushima Daiichi Nuclear Power Station) (excluding the port)(103.5 KB)

to TOP

  1. HOME
  2. Handouts at Press Conference